Opens in a new tab
2026 EPR fees updated in the calculator · Valid from 01.01.2026 · Decree 33/2025 EM, Annex 4
Knowledge · Costs

Hungarian EPR fees: rates per kilogram

Hungarian EPR fees are calculated per material stream and per kilogram. Below are the rates currently in force and an explanation of how your quarterly fee is derived from them.
In short
The fee follows from two figures: the material stream a product or packaging item is assigned to, and the quantity in kilograms placed on the Hungarian market in a given quarter. Both come from your own data.

How the fee is calculated

Each material stream has its own rate in forint per kilogram. The quarterly fee is the sum across all affected streams: quantity in kilograms multiplied by the applicable rate.

A single shipment can touch several streams at once – for example an electrical appliance with a cardboard outer box and a plastic inner wrap. Each component is classified and charged separately.

The rates in force

Material streamHUF / kg
Verpackung
Kunststoffverpackung219
Papier- / Kartonverpackung173
Metallverpackung186
Glasverpackung107
Holzverpackung22
Verbundverpackung191
Textilverpackung148
Sonstige Verpackung129
Elektro
Kleingeräte / IT (unter 50 cm)261
Großgeräte (über 50 cm)124
Bildschirme & Monitore362
Lampen419
Wärmeüberträger116
Photovoltaikmodule63
Batterien
Gerätebatterien & -akkus160
Batterien für leichte Verkehrsmittel239
Industriebatterien239
Elektrofahrzeug-Batterien239
Starterbatterien (SLI)390
Sonstige
Textilprodukte164
Holzmöbel51
Reifen137
Einweg-Kunststoffprodukte113
Werbepapier94
Büropapier128

Rates valid from 2026-01-01. Source: 33/2025. (XI. 28.) EM rendelet, 4. melléklet. Last checked: 2026-09-18. The fees are invoiced by MOHU and are separate from the EPRIVA service fee.

What these rates do not include

The amounts above are the official EPR fees. They are separate from the service fee charged by a provider for registration, classification and reporting. At EPRIVA the two are always shown separately.

Why classification drives the cost

Because rates differ considerably between streams, classification has a direct cost effect. An incorrect assignment leads either to an inflated fee or to an understated report – and potentially to a later payment.

Sources

  • Decree 33/2025. (XI. 28.) EM, Annex 4 – fee rates
  • Government Decree 80/2023. (III. 14.) Korm. – EPR framework and § 10
General information, not legal advice.

What would EPR cost for your range?

Enter your approximate volumes and get an initial estimate of your ongoing EPR costs.